On March 30, 2012, the Federal Energy Regulatory Commission ("FERC" or "Commission") issued an Order on Remand finding that the flow-based cost-allocation methodology used by PJM Interconnection, L.L.C. ("PJM") is inadequate to determine and allocate costs associated with new high voltage transmission lines.

United StatesEnergy and Natural Resources

On March 30, 2012, the Federal Energy Regulatory Commission ("FERC" or "Commission") issued an Order on Remand finding that the flow-based cost-allocation methodology used by PJM Interconnection, L.L.C. ("PJM") is inadequate to determine and allocate costs associated with new high voltage transmission lines.1 Finding that PJM's current static flow-based model for allocating these costs is unjust and unreasonable, FERC further found that a system-wide "postage stamp" method of cost allocation is a "more credible basis" on which to base rates.2 Importantly, FERC emphasized that its determination is limited to this case, and "should not be construed as preventing PJM and its stakeholders from developing other cost allocation methodologies in response to Order No. 1000 or other relevant stakeholder processes."3 Indeed, some interested stakeholders in this proceeding and as part of Order No. 1000 compliance are considering a hybrid and other cost allocation methodologies