HHJ Coulson QC in the recent case of Sydenhams (Timber Engineering) Ltd V CHG Holdings Ltd (2007) - [2007] EWHC 1129 (TCC), had to consider the contractual relations between a developer, contractor and timber engineer in order to establish who was liable to pay the timber engineer.

United KingdomReal Estate and Construction

HHJ Coulson QC in the recent case of Sydenhams (Timber Engineering) Ltd V CHG Holdings Ltd (2007) - [2007] EWHC 1129 (TCC), had to consider the contractual relations between a developer, contractor and timber engineer in order to establish who was liable to pay the timber engineer.

Facts

Sydenhams (Timber Engineering) Ltd, the claimant timber company, made a claim in respect of unpaid design and construction work it carried out on a hotel in Bournemouth for CHG Holdings Ltd, the defendant developer. CHG contended:

  1. that there was never a direct contract between it and Sydenhams; and
  2. that Sydenhams was in fact a subcontractor to the main contractor, Rybarn Ltd.

At CHG’s request, Sydenhams had provided a quote for the design, supply and erection of timber frames and CHG signed the order for manufacture. There was no main contract in place between Rybarn and CHG until some months later. Payment for the works was then discussed between all three parties, and it was