As Mark Pantry explains, unforeseen site conditions
cause delay and cost overruns for projects of all sizes. In 2019
Allan Cook, the chairman of HS2 Ltd, blamed (in part) increased
costs for the flagship infrastructure project on ground conditions
which were "significantly more challenging than
predicted".
The nature of the conditions that are encountered or could be
encountered on site will vary from project to project. For HS2 a
major issue was the changing soil types across the route. Projects
redeveloping brownfield sites may encounter existing structures or
contamination below ground, while projects refurbishing buildings
may discover services not shown on a drawing or in the wrong
place.