Generator slapped with $1.1 million in penalties for failing to obtain approval for the factory settings applied to its wind turbines

Piper Alderman
Piper Alderman
Contributor
Piper Alderman

Piper Alderman

Helping shape the future of business in Australia with practical, commercial and cutting-edge legal...

View firm profile
Explore more from Piper Alderman

The decision highlights the penalties faced by generators that fail to comply with the National Electricity Rules (NER).

AustraliaEnergy and Natural Resources

A recent Federal Court decision highlights the consequences faced by generators that fail to comply with the NER.

In Australian Energy Regulator v Pacific Hydro Clements Gap Pty Ltd [2021] FCA 733, the Federal Court of Australia issued $1.1m in penalties to Pacific Hydro Clements Gap Pty Ltd (Pacific Hydro) for breaching the National Electricity Rules (NER) in relation to the Clements Gap Wind Farm.  Specifically, the Court found that, by failing to obtain approval for the factory settings applied to the protection systems of a number of its generating units, Pacific Hydro contravened r 4.4.3 and cl S5.2.2 of the NER in the period between 6 August 2013 and 3 October 2016.

Facts

Under the NER, wind farm turbines must have the ability to continue operating during periods of voltage fluctuations.  For this reason, each wind turbine at the Clements Gap Wind Farm has a “low voltage ride-through capability”, which is activated during voltage disturbances and allows the turbines