Payment Provisions In Hybrid Contracts And The Effect Of The Construction Act

In the recent case of C Spencer Limited v MW High Tech Projects UK Limited [2019] EWHC 2547 (TCC) the question for the TCC...

United KingdomReal Estate and Construction

In the recent case of C Spencer Limited v MW High Tech Projects UK Limited [2019] EWHC 2547 (TCC) the question for the TCC was this:

Where the contract provides for the execution of both construction operations falling within the ambit of the Act1 and non-constructions operations falling outside the Act, does the payment notice have to separately identify the sum due in respect of construction operations and the basis on which that sum is calculated?

The background to the dispute

MW was the main contractor engaged to construct a power plant. By way of a 2015 subcontract, CSL was required to design and construct the civil, structural and architectural works for completion of the facility. The subcontract was worth £35m.