The Technology and Construction Court makes another [landmark] decision in the case against defective cladding.

United KingdomReal Estate and Construction

The Technology and Construction Court makes another [landmark] decision in the case against defective cladding.

The judgment in the case of LDC (Portfolio One) Ltd v George Downing Construction Ltd and another [2022] EWHC 3356 (TCC) is the second in cladding related claims. This case concerns fire safety (and water ingress) issues affecting the external walls of three high rise tower blocks occupied as halls of residence in Manchester.

The Background

George Downing Construction Ltd ('GDC') was appointed by GMD Developments Limited ("GMD") under a JCT Standard Form Contract with Contractor's design on 11 June 2007 ("the Main Contract"). The Main Contract required GDC to design and construct three individual blocks of student accommodation in Manchester, each over 18 metres in height. The blocks were clad using a mix of cor-ten steel and composite cladding over the various elevations.