The recent Technology and Construction Court decision in
Beck Interiors Ltd v Eros clarified that exceptional
circumstances are required to injunct an adjudication from
proceeding.
In Beck Interiors Ltd v Eros Ltd, the Technology and
Construction Court (TCC) clarified that exceptional circumstances
are required for an injunction to prevent an adjudication from
proceeding.
Background
In 2020, Eros Ltd (Eros) contracted Beck Interiors Ltd (Beck) as
design and build fit-out contractor in the development of The
Residence, Mandarin Oriental, in Hanover Square, London.
The parties fell into dispute and became involved in ongoing
court proceedings and adjudications.
Eros commenced two adjudications in March 2024, in which there
were disagreements over timetabling, particularly the length of
time allowed for Beck's responsive submissions. Eros then
commenced four adjudications in May 2024, claiming substantial
additional payments, and similar timetabling issues