ARTICLE · 27 NOVEMBER 2026
New LEG Clauses: An Ambitious Step, But In What Direction?
The London Engineering Group has released updated versions of its three defect clauses (LEG 1/26, LEG 2/26, and LEG 3/26), which are central to construction all risks policies and renewable energy insurance claims. These revisions introduce express definitions of "damage" and "defect," restructure exclusions, and add provisions excluding "access damage," while addressing ambiguities that drew criticism in recent US court decisions.
The London Engineering Group (LEG) has released new versions of its three defect clauses: LEG 1/26, LEG 2/26 and LEG 3/26.
First introduced in 1996, with LEG 3 subsequently revised in 2006, the LEG clauses have become widely used in construction all risks (CAR) policies and are central to many (if not most) insurance claims under CAR policies. They are also increasingly included in policies covering operational renewable energy risks. Yet judicial consideration has remained limited: two Canadian decisions and an Australian decision have considered LEG 2 or variants of LEG 2,1 while two recent US decisions have considered LEG 3.2 The judicial consideration has also, recently, been critical – with the US judge in the SCB case describing the old LEG 3 as “ambiguous - egregiously so.”3
We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.
The content of this article is intended to provide a general guide
to the subject matter. Specialist advice should be sought about your
specific circumstances.