Draft Strategy
The Greater London Authority Act 1999 requires the London Mayor
to produce a Municipal Waste Management Strategy for London (the
"Strategy"). "London's Wasted Resource", is
the first draft Strategy. It is to be consulted on in two phases.
The first phase of consultation will be with the London Assembly
and Functional Bodies. This was launched on 18 January 2010 and
will close on 15 March 2010. Following this changes may be made to
the Strategy before the second phase of consultation with the
public and stakeholders. This second phase is likely in mid-2010
and will last 3 months. The Strategy is to be published in its
final form by winter 2010.
The draft Strategy provides early signals of potentially
important changes to the management of urban municipal waste. It is
conceivable that principles embedded in this Strategy could be
adopted in other large urban areas. The consultation should be of
interest to not just to those directly involved in the