This article was published in our nuclear briefing, Nucleus.
It is no secret that it is difficult to get planning permission for a nuclear power station in the UK. One of the reasons is our mathematical test on the population around a reactor: the bemoaned semi-urban density population criterion.
The determination process
The Planning Act 2008 classifies a nuclear plant with capacity of more than 50 megawatts as a nationally significant infrastructure project. Applications for such projects in England and Wales fall to be determined by the Secretary of State for Energy Security and Net Zero. The Act obliges the Secretary of State to have regard to national policy statements on nuclear energy generation when deciding whether to grant or refuse an application. The latest policy statement (EN-7) came into force on 18 December 2025. In a move away from its 2011 predecessor (EN-6) its focus is no longer limited to eight specified sites.