Administrators often find themselves in a position where they
need or desire further time to convene a second creditors’
meeting.
The recent Federal Court case of Farnsworth v About Life Pty
Limited (Administrator Appointed), in the matter of About Life Pty
Limited (Administrator Appointed) [2019] FCA 11, provides a
useful summary of the matters taken into account when deciding
applications for extensions of time to convene creditors’
meetings.
The plaintiff in Farnsworth was appointed administrator
on 17 December 2018 and was due to hold the second creditors’
meeting by 1 February 2019. The Court granted an extension
until 8 March 2019.
General principles of section 439A(6)