In response to the Exxon Valdez oil spill, Congress enacted the
Oil Pollution Act of 1990 ("OPA90"). OPA90 imposed
various requirements to prevent and respond to future disastrous
oil spills. Among those requirements is the preparation and
submission of oil spill response plans for all tank vessels and for
certain oil-handling facilities.
An owner or operator who is required to submit a response plan
must, among other things, identify the personnel and equipment
necessary to remove, to the maximum extent practicable, a worst
case discharge and to mitigate or prevent a substantial threat of
such a discharge. The magnitude of the investment, however, in oil
recovery equipment, storage and disposal capacity, and training
personnel to remove discharges, in all foreseeable locations and
operating environments, can be enormous. And the system for
assembling, mobilizing, and controlling these resources is
extremely complex. But to meet OPA90's statutory
requirements, each