Share on LinkedInShare on LinkedIn

ARTICLE · 18 JUNE 2018

Wind Turbine Litigation: Judge Orders Stay Of GE v. Vestas

Duane Morris LLP
Duane Morris LLP
Contributor
Explore more from Duane Morris LLP

The patent litigation between GE and Vestas was put on hold pending the outcome of several challenges to the disputed patents brought at the Patent Trial and Appeal Board.

United StatesIntellectual Property
  • The patent litigation between GE and Vestas was put on hold pending the outcome of several challenges to the disputed patents brought at the Patent Trial and Appeal Board.
  • The patents at issue include both GE and Vestas patents directed to wind turbine technology, and specifically to ensuring safe and reliable connections between wind turbines and the power grid.
  • Based on scheduling at the PTAB, the patent litigation will likely be suspended for a minimum of six months and a maximum of eighteen months.

The U.S. District Court judge hearing a dispute over wind turbine patents between GE and Vestas put the case on hold last week, electing to await developments in a series of challenges brought against the patents at the Patent Trial and Appeal Board (PTAB). In an order signed June 7, 2018, Judge Andre Birotte Jr. indicated that the litigation is stayed (suspended) until the PTAB has issued Institution Decisions in each of the validity challenges filed by GE

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

See more popular content from