Originally appeared in Electricity Deregulation Bulletin, October 2001
Dramatic increases in the cost of electricity in California and Washington, and in the cost of natural gas there and elsewhere in the United States, highlighted the difficulty that manufacturers with long term supply contracts may have in passing on even substantial increases in raw material and power costs to their customers. A manufacturer confronting such a situation must carefully review its supply contracts to determine whether the manufacturer (a) is expressly permitted to pass on such cost increases, or (b) is excused from performing under the contract if its costs increase dramatically (a so-called force majeure clause). Assuming the manufacturer cannot pass the increased costs on and is not excused from performing, but nevertheless attempts unilaterally to impose increases in the contract price for its goods or to suspend performance altogether, the manufacturer’s supply contracts must be examined to