The assumed answer is no, due to a party's ability to
challenge an adjudication where the Adjudicator has no
jurisdiction. However, the correct answer is yes, as set out in
WRW Construction Limited v Datblygau Davies Developments
Limited [2020] EWHC 1965 (TCC).
The employer, Datblygau Davies Developments Limited
("Employer") appointed the contractor, WRW Construction
Limited ("Contractor") under a standard JCT Design and
Build 2011 contract ("the Contract") to design and build
nine residences in Twickenham, London.
Due to various issues on the project, the Employer terminated
the Contract in mid-2018. There were three adjudications in total,
and in the second the Adjudicator decided the Employer had validly
terminated the Contract.