BACKGROUND TO THE CONSULTATION PAPER
About eighty (80) million Nigerians are not connected to the
grid, and an estimated cost of $91 billion is required for grid
extension to them. Given the associated cost, mini-grids present
less capital intensive, and faster alternative to increasing access
to electricity and promoting the use of renewable energy. In line
with Nigeria's National Renewable Energy and Energy Efficiency
Policy (NREEEP) and Sustainable Energy for All
(SE4All) action plan, the country has set a
renewable energy generation target of 30% for 2030.1
In 2017, an all-encompassing framework specific to mini-grids,
the Regulation for Mini-Grids 2016 (Mini-Grid
Regulation or the Regulation), was
adopted by the Nigerian Electricity Regulatory Commission
(NERC). In August 2022, NERC released a
Consultation Paper on Proposed Review of Regulation for Mini-Grids
2016 (Consultation Paper) with the aim of
obtaining comments, objections, and representations from