Share on LinkedInShare on LinkedIn

ARTICLE · 13 MAY 2024

Nuclear Power: Awaiting Its Turn!

Phoenix Legal
Phoenix Legal
Contributor
Phoenix Legal

Phoenix Legal

Phoenix Legal is a leading full-service Indian law firm, founded in 2008, providing comprehensive...

View firm profile
Explore more from Phoenix Legal

Based on the official figures made available by the Department of Atomic Energy, a department under the direct control of the Prime Minister of India ("DAE")...

IndiaEnergy and Natural Resources

Based on the official figures made available by the Department of Atomic Energy, a department under the direct control of the Prime Minister of India ("DAE"), the installed nuclear power capacity in India as of February, 2024 stood at 7,480 MW (which is 1.6% of our total installed capacity). The current nuclear power projects comprise of 19 pressurised heavy water reactors ("PHWRs"), 2 boiling water reactors and 2 pressurised water reactors.

The Government of India ("GoI") seems to recognize the role that nuclear power could play in ensuring long term energy security, and in helping India achieve its ambitious targets of 500 GW of installed capacity from non-fossil sources by 20301 and honouring its commitments under the Paris Climate Accord i.e.,: (i) to reduce emission intensity to 45% below 2005 levels by 2030, (ii) generate about 50% of its power from non-fossil fuel-based energy resources by 2030, and (iii) achieve net-zero carbon emissions by 20702. And, this

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from