I. Introduction
For much of the last decade, financing an Indian renewable energy project usually meant financing a familiar solar or wind template: a long-term power purchase agreement, a tariff discovered through bidding or assessed against the applicable CERC framework, and payments linked to power actually supplied2. This template was typically backed by a letter of credit, mortgage and hypothecation package. It still matters, but it does not fully answer the lenders’ questions for newer asset class such as battery energy storage systems (“BESS”), green hydrogen and firm and dispatchable renewable energy (“FDRE”). Each has a different payment logic from the simple “rupees per unit generated” model. These models range from availability-based capacity payments to production-linked subsidies, requiring lenders to revisit cash flows, subsidy eligibility, security packages, step-in rights, enforcement risk and the allocation of risk between the developer, the offtaker and the