Suppose you own a commercial building and intend to lease it to
various tenants. But before you do, you need to make a number of
improvements, so you hire a contractor.
The contract between you and the contractor is expected to last
approximately one year. However, about seven months into the
contract, you notice multiple issues with the contractor's
work:
- Numerous water leaks;
- The exterior painting is sloppy, incomplete, and incorrectly
applied; and,
- There are multiple cracks in the flooring.
These errors – known as deficiencies in
the construction industry – can range between severe (leaks
in a roof) and less severe (the painting is incorrect). Many times,
an owner in this situation will become extremely frustrated with
the contractor and consider terminating the contract. The question
is – is this legally permissible?