A D.C. hospital operator's effort to get its HVAC system
upgraded has backfired in nightmarish fashion for the operator.
Hospital operator DCA leased its Northeast D.C. premises from
Capitol Hill Group starting in late 2014.
Shortly before the lease was signed, Capitol Hill Group had
broken off a portion of the building as a residential property and
decoupled the existing HVAC system, which involved installing HVAC
components in the remaining hospital premises. The DCA lease
acknowledged that Capitol Hill Group "has installed a new HVAC
system within the [b]uilding."
Upon occupying the premises, DCA came to believe that this
"new HVAC system" did not adequately heat, cool, and
ventilate the hospital. The alleged inadequacy related to the fact
that Capitol Hill Group had installed only new boilers, chillers,
and pumps, not new distribution components (i.e., air
handlers and fan-coil units).