An ounce of prevention is better than a pound of cure, so the
old adage goes. Although contraction of the Coronavirus
("COVID-19") fortunately remains a relatively low risk in
the United States, COVID-19 still has the ability to
"infect" a project schedule simply by reducing the supply
of labor and materials needed to complete the work. To
prevent such delays and others like them, contractors should take
precautionary measures and factor in possible labor and material
delays to schedules, and any corresponding price impact, resulting
from the spread of COVID-19. Contractors need to consider impacts
not only in the United States, but for imported construction
materials as well – especially long lead items or materials
from highly infected areas (i.e., Italian marble or Chinese
steel). If faced with projects requiring materials from
highly affected areas, alternate or substitute materials may be an
appropriate approach to stay on schedule.