Background
In the previous article in this series
The Future of Carbon Dioxide Injection EOR in the United
States, we discussed the sources and cost of CO2
supply for enhanced oil recovery ("EOR") in the United
States and the benefits that CO2EOR technology can bring
to an otherwise mature oil reservoir that has reached its useful
productive life.
This article examines the U.S. pipeline system and the
regulatory regime for the transportation of CO2 across
public and private land and some of the potential means of securing
rights-of-way to the land where construction of a new pipeline
corridor is planned.
In order to transport CO2 necessary for
CO2EOR operations, U.S.-based oil producers rely on a
network of over 50 privately held pipelines spanning some 7,200km
in length across the U.S.1 Of this, Texas boasts the
largest network, which includes 1,200km of pipelines centered along
the Gulf Coast (namely Mississippi, Louisiana and eastern Texas).
An additional