Until the recent explosion in demand for data centers, driven by
requirements for artificial intelligence platforms, siting data
centers required a holistic assessment of such factors as
connectivity (i.e., to minimize latency and capital costs), land
availability, climate, tax incentives, natural disaster resilience,
and inexpensive and reliable power.
State energy policy is no longer just background
noise—it's become the frontline filter for where
hyperscale infrastructure can and can't be built
Electricity demand is rising at rates not seen in
decades—driven by the explosive growth of AI and data
centers, increased onshoring of energy-intensive manufacturing, and
the broad electrification of transportation and buildings. Load
growth of 3–5 percent annually through 2030, more than double
historical norms, is no longer a future scenario—it is
already showing up in interconnection queues and utility forecasts.
The U.S. grid is lacking generation capacity