On September 1, 2017, FERC rejected without prejudice the
California Independent System Operator Corporation's
("CAISO") April 18, 2017 proposal to revise the CAISO
Tariff to create a new class of participating transmission owner
("PTO") called the "Certified Small PTO," whose
low-voltage, generator-interconnection-driven network upgrade costs
would be allocated regionally, rather than locally.
The CAISO transmission system consists of four load-serving
PTOs, each of which assesses "local transmission access"
charges on its respective load customers. These charges
recover costs associated with network upgrades to low-voltage
transmission facilities (below 200 kV) on the CAISO system.
In contrast, for high-voltage network upgrades, costs are
recovered through a "regional transmission access" charge
paid by utility distribution companies and metered subsystem
operators based on gross load in their service areas. Three
of the four load-serving PTOs are the large