In a September 1, 2020 order the Federal Energy Regulatory Commission overturned longstanding precedent and denied a renewable developer's application.

United StatesEnergy and Natural Resources

In a September 1, 2020 order 1 the Federal Energy Regulatory Commission ("FERC") overturned longstanding precedent and denied a renewable developer's application to designate a solar-plus-storage hybrid facility as a small power production Qualifying Facility ("QF") under the Public Utility Regulatory Policies Act of 1978 ("PURPA"). FERC concluded that the facility exceeded PURPA's 80 MW limit for small power production QFs because the facility's design included a 160 MW solar array, even though other system components rendered the facility as a whole physically incapable of providing a net output of more than 80 MW of electricity.2 FERC's new approach for determining the 80 MW limit will complicate the ability of projects like the one addressed in the order to achieve QF status, i.e., projects designed with oversized generation components (for example, to optimize output across time periods) that are otherwise limited by other components to achieve an output of no

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

Because of the generality of this update, the information provided herein may not be applicable in all situations and should not be acted upon without specific legal advice based on particular situations.

© Morrison & Foerster LLP. All rights reserved