FERC Finds Request To Treat Pumped Storage As Transmission Facility Premature

On September 20, 2018, FERC dismissed Nevada Hydro Company, Inc.'s ("Nevada Hydro") request.

United StatesEnergy and Natural Resources

On September 20, 2018, FERC dismissed Nevada Hydro Company, Inc.'s ("Nevada Hydro") request that (1) the Lake Elsinore Advanced Pumped Storage ("LEAPS") facility is a transmission facility and (2) LEAPS is entitled to cost-based rate recovery under the California Independent System Operator Corporation's ("CAISO") Transmission Access Charge.  FERC found that Nevada Hydro's request is premature because LEAPS has not been studied in the CAISO Transmission Planning Process ("TPP") to determine whether it addresses a transmission need identified through that process, and, if such a need were met, how the facility would be operated.

Nevada Hydro's proposed $2 billion LEAPS project consists of two primary components: (1) a 500 MW pumped storage facility to be located on Lake Elsinore in Riverside, California; and (2) the Talega-Escondido/Valley-Serrano 500 kV Interconnect, a 30-mile transmission line that will interconnect the pumped storage facility to the transmission

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from