Share on LinkedInShare on LinkedIn

ARTICLE · 30 SEPTEMBER 2014

Thames Tideway Tunnel Gets Green Light

The Thames Tideway Tunnel, nicknamed London's new "super-sewer", received planning consent on 12 September 2014.

United KingdomReal Estate and Construction

The Thames Tideway Tunnel, nicknamed London's new "super-sewer", received planning consent on 12 September 2014.

The project, which forms part of the Mayor of London's Infrastructure Plan for London, will take seven years to build at a cost of £4.2billion.

Why does London need a 'super-sewer'?

London's sewers were built in the 1860s by Sir Joseph Bazalgette to prevent raw sewage being flushed straight into the Thames (which at the time was thought to be responsible for a series of cholera outbreaks) at a cost of £4.2million. Whilst this cost was undoubtedly huge at the time, Thames Water estimates that re-building Bazalgette's system today using modern methods would cost in the region of £50-60billion.

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

See more popular content from