The 2nd edition of the UK's only standard form Building Information Modelling (BIM) Protocol was published on 10 April 2018 following significant consultation with the construction industry...

United KingdomReal Estate and Construction

The 2nd edition of the UK's only standard form Building Information Modelling (BIM) Protocol was published on 10 April 2018 following significant consultation with the construction industry, legal practitioners and standard contract publishing bodies and is stated to have 'been updated to reflect current practices and standards regarding the use of BIM'. Sarah Rock takes a look at some of the main changes.

PAS1192-2

One very welcome addition in the updated Protocol, which will please most BIM purists, is the inclusion throughout of reference to PAS1192-2 (the standard which sets out the BIM requirements for the CAPEX phase of a project). PAS1192-2 is seen by many as defining BIM Level 2 and as providing all of the processes and workflows which are to be followed. Aligning these two documents and changing the Protocol's terminology to be consistent with PAS1192-2 will surely allow for more coherence across BIM projects.