Key Points
- Provisions of the Civil Procedure Rules apply to applications
for an extension of time to apply for rescission of winding up
order
- Any such extensions of time should be exceptional and for a
very short period
The Facts
Cre8atsea Limited (the Company) was wound up by
the court in March 2013 in respect of a petition originally
presented in November 2011. The applicant (A) was
a director of the Company and applied for an extension of time to
enable him to apply to have the winding up order rescinded in May
2015 on the basis that he was both a creditor and contributory and
there had been an obvious injustice in making the order.
Decision
The court held firstly that, on the evidence, A was neither a
creditor nor a contributory and therefore his application failed
for lack of standing. In any event, even if A had standing to make
the application it would have failed. The Insolvency Rules require
an application for rescission to be made within 5