The National Solar Mission or the Jawaharlal Nehru National Solar Mission (the "JNNSM") adopted by India in 2010 targets generation of 100,000 MW of grid connected solar power capacity by 2022.

IndiaEnergy and Natural Resources

1. INTRODUCTION

The National Solar Mission or the Jawaharlal Nehru National Solar Mission (the "JNNSM") adopted by India in 2010 targets generation of 100,000 MW of grid connected solar power capacity by 2022.

It's an ambitious target in view of India's current generation capacity of approximately 5,000 MW,1 but the intent of the Central Government is reflected in various policies and subsidy schemes floated to encourage growth of the solar industry.

The JNNSM aims to "establish India as a global leader in solar energy, by creating the policy conditions for its diffusion across the country as quickly as possible"2.

In furtherance of that aim, we have recently seen favorable state level policies, a feed-in-tariff regime, viability gap funding mechanisms, capital subsidies, progressive net-metering arrangements and solar specific renewable purchase obligations that have created a supportive environment to develop solar power in the country.