The Central Electricity Regulatory Commission (“CERC”) by way of its order dated 13.03.2026 in Petition No. 1/SM/20261 has proposed to revise the rate of congestion charges applicable in real-time operation of the inter-State transmission system and has also clarified that renewable energy (“RE”) generators cannot be exempted from such charges.
CERC noted that the existing congestion charge of Rs. 5.45/kWh was fixed in 2010 based on the then Unscheduled Interchange regime. It further observed that the power sector has undergone significant changes over the past 15 years.
CERC held that congestion is a matter of grid security and all entities contributing to congestion must remain subject to the same framework. It also noted that, with large-scale integration of RE, RE sources cannot be excluded from the congestion charge mechanism. Therefore, CERC declined to exempt RE generators from congestion charges.