Introduction
The Central Electricity Regulatory Commission (CERC), vide
Notification dated 26 June 2025, has notified the CERC (Sharing of
Inter-State Transmission Charges and Losses) (Fourth Amendment)
Regulations, 2025 (Fourth Amendment Regulations).
Aligned with the policy priorities of the Ministry of Power,
Government of India, the Fourth Amendment Regulations seek to
support the expansion and integration of Renewable Energy (RE)
sources, Battery Energy Storage Systems (BESS), and green hydrogen
/ ammonia plants into the national grid framework.
Notably, the CERC has confirmed the industry-wide speculation of
gradual phasing out of the waiver for Inter-State Transmission
Charges (ISTC) on RE Generating Systems based on wind or solar
source (REGS) and Renewable Hybrid Generating Systems based on a
combination of wind and solar source (RHGS), based on the
commissioning of such generating systems.