Buried near the end of most construction contracts are
contractual warranties. These clauses rarely receive much attention
or comment but, a recent court decision has highlighted the risks
inherent in these common clauses.
In Greater Vancouver Water District v. North American Steel
and Pipe Ltd., the GVWD contracted with North American to
supply steel pipe for a waterworks project. The GVWD and its
consultants had prepared the design and specifications for the
steel pipe that was to be supplied by North American. In the
contract, North American gave two relevant warranties to the GVWD
with respect to the steel pipes. First, North American warranted
that the steel pipes would conform to the specifications; and
second, that they would be "free from all defects arising at
any time from faulty design in any part of the Goods." Unusual
wording one would think given that the design had not been
undertaken by North American. Even more troubling was that the
design was