ARTICLE · 04 FEBRUARY 2025

National Instrument 43-101: Approach To Multiple Economic Scenarios In One Technical Report

Cassels
Cassels
Contributor
Cassels

Cassels

Cassels Brock & Blackwell LLP is a Canadian law firm focused on serving the transaction, advocacy,...

View firm profile
Explore more from Cassels

A technical report that includes an economic study of a property should present clear, consistent, and defensible predictions and assumptions about future mineral production...

CanadaEnergy and Natural Resources

A technical report that includes an economic study of a property should present clear, consistent, and defensible predictions and assumptions about future mineral production, regardless of the property's stage – a preliminary economic assessment (PEA) (having the lowest confidence level), a pre-feasibility study (PFS) (having a higher confidence level than a PEA) or a feasibility study (FS) (having a higher confidence level than a PFS).

A technical report summarizes the preferred or selected option for development and/or production, rather than showcasing options or alternative scenarios. The rationale in the pre-development phase is that an issuer should be able to use the study contained in the technical report to demonstrate how it is going to proceed to develop and build the project and to illustrate the funds required to achieve this objective. Consequently, technical reports generally should not present multiple competing economic scenarios or trade-off

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from