In Grasshopper Solar Corporation v Independent Electricity
System Operator,1 the Court of Appeal agreed that a
contractual party has a right to terminate a contract without
paying damages if the other party does not achieve the performance
to which it agreed in the contract. The Court also held that
the Respondent was not estopped from terminating the contract
despite an alleged shared assumption that it would not do so under
the doctrine of estoppel by convention. This is because the
shared assumption was found not to be between the parties but,
rather, between the Respondent and third parties.
Factual Background
Grasshopper Solar Corporation, GSC Solar Fund I Inc., One Point
Twenty One Gigawatts Inc., Egerton Polar Power LP, and MPI GM Solar
1 LP (collectively, the "Solar
Companies") entered into contracts with the
Independent Electricity System Operator
("IESO") in 2016 for the construction of
solar facilities that would provide energy to the