From 1 November 2011 transitional provisions of the Building
Energy Efficiency Disclosure Act 2010 (Cth) (BEED
Act) give way to full obligations. The provisions require
a corporation that owns a building considered to be 'disclosure
affected' under the BEED Act to have and register a current
Building Energy Efficiency Certificate (BEEC)
where the building is being marketed for sale or lease. Lessees of
disclosure affected buildings or parts of buildings will also have
requirements in relation to subletting.
At this stage the circumstances in which a building or part of a
building will be considered 'disclosure affected' are
restricted by size and use. The building or part of a building must
have a net lettable area of at least 2000m2 and over 75% of the
space must be used (or capable of being used) as a commercial
office. Whilst there has been some discussion about extending the
scope of the BEED Act to hotels, retail centres, educational
institutions and hospitals,