In brief - a recent decision of the NSW Supreme Court in Ryals Hotel Pty Ltd v Zhaos Pty Ltd [2020]  NSWSC 719,  sheds light on how the courts may calculate damages where a lessee hotel operator is unable to use a significant service asset of the premises due to a breach of lease by the lessor property owner.

Background

The plaintiff leased a building from which it operated the Ryals Hotel Broadway in Glebe. At the time that the lease was entered into there was no operational lift in the building but the lease provided that the lessor was "in the process of" installing a new lift. The lift was eventually installed six months later, but in the interim period without an operational lift, guests staying on the top floor had to walk up four flights of stairs, the construction work caused a disruption for guests, and the basement level (the main hub of the works) could only be used for storage.

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from