Grant of indemnity: But is it even worth the paper its written on?

This case looked at when an admission of liability by an insurer can be withdrawn by the insurer at a later date.

AustraliaInsurance

The Supreme Court of New South Wales in the matter of Mobis Parts Australia Pty Ltd v XL Insurance Company SE [2016] NSWSC 912 looked at when an admission of liability by an insurer can be withdrawn by the insurer at a later date.

The facts:-

  • The plaintiff, Mobis Parts Australia Pty Ltd, is the owner of a warehouse at Eastern Creek in Sydney that was severely damaged in a storm on 25 April 2015. A large amount of hail accumulated on the warehouse roof and it collapsed.
  • The plaintiff made a claim under a Property Damage & Business Interruption Policy issued by the defendant, XL Insurance Company SE (XL), on 8 August 2014 (the Policy).
  • A consulting engineering firm was retained by XL to undertake a structural engineering review of the warehouse, the objective of which was to assess compliance with the relevant Australian Standards. This was of relevance to XL because of an exclusion clause in the Policy in respect of "faulty or defective design or materials" (