Ian McLeod is the head of Ergon Energy, the state-owned network
operator and retailer that finds itself at the cutting edge of the
energy revolution, thanks to extraordinary area it covers (97 per
cent of Queensland), its sparse population, and a huge uptake of
rooftop solar.
As part of its Queensland energy special, McLeod agreed to
answer 10 questions from RenewEconomy, starting off with how he
would build the grid if he had the opportunity to start over with
all the technologies and know-how currently available.
RE: If you were to design the Ergon grid from scratch
now, what might it look like?
McLeod: There isn't one answer that covers
our entire grid.
We have 160,000km of network covering a mix of large and small
loads, isolated and high-density areas. For instance, take SWER
(Single Wire Earth Return transmission lines). We have 65,000km of
SWER network, and given the technological advances available today
we probably wouldn't build a complete SWER