Share on LinkedInShare on LinkedIn

ARTICLE · 12 OCTOBER 2015

Federal Circuit: PTAB's Claim Construction Standard Is BRI, But Sometimes With An Obligation

In a decision with potentially far-reaching impact, U.S. Court of Appeals for the Federal Circuit concluded that the Board of Patent Appeals and Interferences (Board) in arriving at a claim constructions, is obligated to consider a prior district court construction of the same term.

United StatesIntellectual Property

Power Integrations v. Lee

In a decision with potentially far-reaching impact, U.S. Court of Appeals for the Federal Circuit concluded that the Board of Patent Appeals and Interferences (Board) in arriving at a claim constructions, is obligated to consider a prior district court construction of the same term. Power Integrations v. Lee, Case No. 14-1123 (Fed. Cir., Aug. 12, 2015) (Mayer, J.).

Power Integrations (PI) challenged the PTO's decision affirming the final rejection of claims during an ex parte reexamination that Fairchild had filed against a patent directed to a technique of minimizing electromagnetic interference occurring in power supplies. PI had brought suit against Fairchild alleging infringement of the patent. During the district court claim construction proceedings PI argued that the claim term "coupled" required that two circuits be connected in a manner "such that voltage, current, or control signals pass from one to another" and that the recited

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

See more popular content from