In June 2018, the Technology and Construction Court (likely)
brought an end to what Fraser J could only describe as
"some long running, and bitterly fought,
litigation"1 with his decision in Imperial
Chemical Industries Limited v Merit Merrell Technology
Limited.2 Ultimately, this dispute consisted of
four adjudications and numerous judgments, including those
resulting from a split trial (with one determining liability in
20173 and the other quantum in June 2018).
The liability and quantum judgments serve as scathing guides as
to "what not to do" both when completing a construction
project and when appearing as a party to a court proceeding; making
them important decisions not only for those in the construction
industry, but also those who engage in litigation in general. The
lessons arising from the recent quantum decision are summarised
below. For analysis of the lessons coming out of the 2017 liability
decision, please see Issue 206 (August 2017) of