The Lands Tribunal for Scotland has found in principle that
compensation payable under paragraph 7(1) of Schedule 4 to the
Electricity Act 1989 following the grant of a necessary wayleave
may be valued on a ransom strip basis.
What is the claim?
A claim has been brought by William Wyness against Scottish Hydro Electric
Power Distribution plc (SHEPD) for compensation amounting to
£1,712,000 following the grant by the Scottish Ministers of a
necessary wayleave under paragraph 7(1) of Schedule 4 to the
Electricity Act 1989.
Mr Wyness is the owner of Meikle Camaloun Farm, on which a 500
kilowatt wind turbine has been erected. Adjacent lies South
Camaloun Farm, which is in separate ownership. A similar turbine
has been constructed on South Camaloun, a short distance from the
Meikle Camaloun turbine. Both turbines are connected to the
electricity grid via an 11 kilovolt cable that runs from the
substation, across a neighbouring estate, through part of Meikle
Camaloun