Case Numbers: 4A_288/2023 and 4A_572/2023 (11 June 2024)
Request for revision of interim award based on subsequent ICC
disqualification of two arbitrators refused
In two recent French-language decisions both rendered on 11 June
2024 and slated for official publication, the Swiss Supreme Court
dismissed two requests for revision filed by NIOC against a US$32
billion ICC interim award based on the successive disqualifications
by the ICC of two of the arbitrators in the underlying arbitration
for circumstances that postdated the award.
The Supreme Court held, in both decisions, that, to justify the
revision of an award under article 190a(1)(c) of the Swiss Private
International Law Act (PILA), the ground for challenge of an
arbitrator must have existed at the time of the issuance of the
award. The occurrence of a ground for challenge of an arbitrator
after the award was rendered does not, of itself, constitute a
ground for revision of the award.