Share on LinkedInShare on LinkedIn

ARTICLE · 11 OCTOBER 2016

The Oil & Gas: Ezine April 2016

OneSubsea has announced successful commission of Subsea Boosting Systems in the Gulf of Mexico.

IndiaEnergy and Natural Resources

OneSubsea has announced successful commission of Subsea Boosting Systems in the Gulf of Mexico

April 04, 2016

OneSubsea, a Schlumberger company has come up with a subsea boosting systems installed in ultra deep waters, located in the Gulf of Mexico. This system helps in cost effective recovery from the reservoirs. It has been installed at a depth of 7000 ft. and consists of 3 retrievable single phase pumps of 3.0 MW each.

Lula Alto oilfield put into production

April 12, 2016

Lula Alto pre-salt oilfield of Sinopec Corporation Brazil's PB project was put into production. The Lula Alto oilfield is situated in the middle part of Lula oilfield in the BM-S-11 block of Santos Basin and it produces 30,000 barrels per day of crude oil and 1 million cubic meters of natural gas per day.

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

See more popular content from