Share on LinkedInShare on LinkedIn

ARTICLE · 13 AUGUST 2026

Consumer Cannot Be Burdened With Depreciation Beyond The Useful Life Of A Power Plant

The Apex Court in the case, Delhi Electricity Regulatory Commission vs TATA Power Delhi Distribution Ltd., held that electricity consumers do not have to bear power plant depreciation costs for the period during which they weren’t supplied electricity.

IndiaEnergy and Natural Resources

Introduction:

The Apex Court in the case, Delhi Electricity Regulatory Commission vs TATA Power Delhi Distribution Ltd.1, held that electricity consumers do not have to bear power plant depreciation costs for the period during which they weren’t supplied electricity. The Supreme Court allowed the Appeal filed by the Delhi Electricity Regulatory Commission (“DERC”) under Section 1252 of the Electricity Act, 2003 (“the Act”) and overturned the order of the Appellate Tribunal for Electricity (“APTEL”). The Order passed by DERC dated 11.11.2019 was restored.

Genesis of the case:

TATA Power Delhi Distribution Ltd. (“TPDDL”), brought forward their proposal to establish a temporary 108-megawatt gas-based Power Plant at Rithala, which was to run for an operational period of 5-6 years, after which the land would go back to the Delhi Development Authority.  From the beginning itself, the operational period of the Plant was supposed to be limited as its main purpose was to serve the needs of

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from