On March 30, the
Environmental Protection Agency (EPA) published its proposal to reissue the
National Pollutant Discharge Elimination System (NPDES) Storm Water Multi-Sector
General Permit for Industrial Activities (MSGP-2000). 65 Fed. Reg. 17,010.
The deadline for a facility discharging under the existing MSGP to file a Notice
of Intent (NOI) to use the MSGP-2000 is December 29. Facilities with new storm
water discharges must submit a NOI no later than two days before commencing
discharge.
To follow is a summary
of the key changes from the existing MSGP.
Water
quality
The MSGP-2000 addresses
EPA’s concerns about discharges to impaired water body segments for which states
are required to develop Total Maximum Daily Loads (TMDLs). TMDLs are to quantify
the loading of a particular pollutant a water segment can assimilate and still
meet water quality standards and allocate that amount to the sources of that
pollutant discharging to the water segment.