Share on LinkedInShare on LinkedIn

ARTICLE · 10 MARCH 2025

Withdrawing Backcharges In An Adjudication And Call On Performance Bond

The Appellate Division in Ee Hup Construction Pte Ltd v China Jingye Engineering Corporation Limited (Singapore Branch) & Anor [2025] SGHC(A) 3 (the "Judgment") rendered an interesting decision that, among others, dealt with the effect of withdrawing backcharges from an adjudication and its effect on a subsequent call on a performance bond.

SingaporeLitigation, Mediation & Arbitration

The Appellate Division in Ee Hup Construction Pte Ltd v China Jingye Engineering Corporation Limited (Singapore Branch) & Anor [2025] SGHC(A) 3 (the "Judgment") rendered an interesting decision that, among others, dealt with the effect of withdrawing backcharges from an adjudication and its effect on a subsequent call on a performance bond.

Background. The 1st respondent ("CJY") was the main contractor engaged by the Land Transport Authority for a project involving the construction of the Bedok South Mass Rapid Transit train station and tunnels for the Thomson-East Coast train line (the "Project"), and had engaged the appellant ("EH") as its sub-contractor to carry out excavation and earthworks (the "Sub-Contract") (Judgment [4]).

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

See more popular content from