In P v. M [2019] HKCFI 1864; HCCT 6/2019 (24
July 2019), the Hong Kong Court of First Instance set aside
parts of two arbitral awards which were found to be in breach of
procedural fairness resulting in substantial injustice.
Background
This is the second of two set aside applications arising from
the same underlying arbitration based on a construction contract
(Contract) which provided for domestic arbitration
in Hong Kong. M had claimed against P for monies to which it was
entitled under the Contract. After a first hearing in November
2017, the tribunal issued an interim award against P, ordering it
to pay damages for loss and expense (First
Award).
Challenge to the First Award