A Bidders' Inexcusable Error Does Not Prevent It From Claiming A Higher Price From The Client Requesting The Work

The City of Salaberry-de-Valleyfield retained the services of the engineering firm CIMA to develop plans and specification and grant contracts. CIMA selected the lowest bid

CanadaLitigation, Mediation & Arbitration

Construction N.R.C. inc. vs. Loiselle inc. et al.  2019 QCCS 1440 (The Honourable Chantal Lamarche)

 

The City of Salaberry-de-Valleyfield retained the services of the engineering firm CIMA to develop plans and specification and grant contracts. CIMA selected the lowest bid, that of the Defendant Loiselle. Loiselle therefore won the contract to build Industrial Boulevard as a general contractor. The work included burying conduits used by Hydro-Quebec and Bell to run their cables. 

Loiselle sub-contracts this work to the Plaintiff NRC. A dispute quickly arose as to the interpretation of the specifications with respect to the unit of measure on which the installation price of the conduits is based; the bidder was basing its calculation on linear meters of conduit, whereas the City believed that the price offered in the tender and accepted by the bidder would be per linear meter of duct bank. The difference in price is considerable. The bidder agreed to carry out

We operate a free-to-view policy, asking only that you register in order to read all of our content. Please login or register to view the rest of this article.

The content of this article is intended to provide a general guide to the subject matter. Specialist advice should be sought about your specific circumstances.

See more popular content from