The Supreme Court of Canada has released its much-anticipated
decision in Ledcor Construction Ltd. v. Northbridge Indemnity
Insurance Co.1 The case is notable in three ways.
First, it continues a trend of the Court bringing real commercial
sense to the interpretation of insurance policies. Second, it
restricts the scope of the faulty workmanship exclusion to the
actual cost of redoing the work. Third, it unfortunately provides
unnecessary commentary that may result in some ongoing uncertainty,
particularly in the area of faulty design.
The facts of the Ledcor decision are straightforward. A
contractor was hired to clean the windows of the EPCOR Tower in
Edmonton. At the time, the building was under construction and was
insured under an all risks builders-risk wrap-up policy (the
"Policy"). In the course of cleaning the windows, the
contractor used improper materials and equipment, resulting in
significant damage to them. The owner and general contractor
claimed the